Dr. Joe Waidhofer Drinking Water Treatment Plant Disinfection System Design Project
The Project, of which the Work under the Contract Documents is a part, is generally described as follows: Construction of new sodium hypochlorite storage and feed facilities, including a bulk storage facility, sodium hypochlorite feed building, site modifications and improvements to support the facilities, chemical feed piping to application points, power and control, startup and commissioning, and selective demolition of the existing chlorine storage and feed systems.
Plan Holders
Date | Company | Contact |
2/9/22 8:17 am |
ConstructConnect
3825 Edwards Rd. Suite 800 Cincinnati, OH 45209 |
Michael Stubbs
Sr. Editorial Content Lead
Tel: 800-364-2059
|
2/2/22 4:32 pm |
Construction Bidboard, Inc.
11622 El Camino Real # 100 San Diego, CA |
000 Plan Room
Tel: 800-479-5314
|
2/7/22 1:12 am |
Dodge Data & Analytics
2860 S State Hwy 161 Ste 160 #501 Grand Prairie, TX 75052 |
Jayalakshmi L
Other
Tel: 413-376-7032
Fax: 609-336-2767
|
2/8/22 12:50 pm |
Pacific Infra Structure
435 Boulder Ct # 200 Pleasanton, CA 94566 |
Mark Jorgenson
Tel: 9252490011
|
2/8/22 1:37 pm |
Valentine Corporation
111 Pelican Way San Rafael, CA 94901 |
Val McCauley
Tel: 415-453-3732
|