Dr. Joe Waidhofer Drinking Water Treatment Plant Disinfection System Design Project

The Project, of which the Work under the Contract Documents is a part, is generally described as follows: Construction of new sodium hypochlorite storage and feed facilities, including a bulk storage facility, sodium hypochlorite feed building, site modifications and improvements to support the facilities, chemical feed piping to application points, power and control, startup and commissioning, and selective demolition of the existing chlorine storage and feed systems.

Status

Bidding Closed

Prebid Date 2/10/22 10:00am
Bid Date 3/3/22 3:00pm

Company & Contacts

Stockton East Water District
Darrel Evensen  
devensen@sewd.net

Location

Stockton, CA

Engineer’s Estimate: $4,750,000